Houses from a bar up to 500 thousand rubles. How to build an inexpensive house. Turnkey house - buy or build

Next, you will find the story of the construction of one house from an ordinary family. A modest and very limited budget did not stop them on their way to the dream of acquiring their own private home. What came of this, what difficulties our heroes faced and what solutions they used to reduce the cost of construction, this post will tell about all this.

Construction is carried out as soon as funds are available.

Plot. Burian, no fences. There is an iron garage and electric. pillar at the border of the site.

The plot itself cost 400 thousand rubles. District of Bashkiria, plot 2 km from the city.

We made a fence, bought pickets for 5 rubles each, crossbars 30 rubles. Painted garage, paint (drying oil + bomb-aluminum) 300 rubles

The result is a strip foundation, 120 in height and 40 in width. Kamaz pgs was bought for 6.t.r. and about 10 bags of cement.

From the moment of purchase the uch-ka spent about 15 tr

We took out a loan of 40 tr. We bought 10 pallets of aerated concrete blocks, like 36 thousand, they took glue and cement for the remains, for mixing

Masonry work began.

So far spent 55 tr.

The box is ready. Not fully posted (The back wall is off-screen, it will be frame, for the possibility of expanding the house and fine-tuning it to the planned 9.5x9.5).

We bought a uterine bar for 10t.r

Frame back wall.

Began to deal with electricity 10 kW. Shield, 3-phase 2 tariff meter, grounding. I assembled it completely myself, the electricians simply attached the vulture to the pole.

Cost 10t.r.

So far spent 75 tr.

The foundation was waterproofed. Acquaintances fitted the used door at the door. We bought osb tiles, for 7 tr.

We hired a front-end loader for land work. 2t.r.

Sprinkled on the foundation.

We started to make a temporary roof. We bought 7 rubles worth of bars. and roofing material 2t.r. On the crate for 5 tr.

Almost 100 rubles were spent. about.

Wooden windows were added.

I am 22, my father is 53 years old. Workers. I get 10, and my father is 14 tr. I am an electrician and he is a locksmith.

Winter has begun.

In late autumn, they made a well, bought 5 rings of 1,200 rubles, half dug up the rest of the drunks themselves. Pipes for communications. We bought 6,000 boards for the ceiling and a concrete mixer for 8.

Spent 120 tr.

We made a rough ceiling. Then I plan to drywall or stretch.

San. node.

Also in April, the water supply and sewerage system were laid. The concrete screed was poured. We bought 2 pallets of bricks, 10 bags of cement, forest sand. We started to make the bathroom.

Spent from the date of purchase of the site, 130 tr.

Well spent the other day:

Shower cubicle, according to stock 10.000

Toilet 3700

Washbasin with a pedestal 2000

Two lever mixers 800 each

Sink with legs ala "village" for a temporary kitchen 1500

EPS 7 sheets for 750 rubles

Polypropylene pipes 600 rubles

5 bags of cement RUB 850

Soldering iron rental 200

Total spent from the date of purchase 158,000 rubles

Civilization is slowly coming.

We bought a storage water heater for 9000. And a pumping station, the action cost 3800 rubles.

My work place.

General form.

Garden. In the garden, cabbage, potatoes, raspberries, currants, grapes, corn, beets, apple trees, thorns, carrots, mint, onions, parsley, cherries and more.

And now the extension of the house. It is quite comfortable to live in the built part.

Drew a sketch of the future expansion.

Expansion will be carried out using TISE technology

TISE technology in the video

5 cans of polyurethane foam 1300

Foam gun 500

China metal door 3000

Electric convector 2kw 2000

Apple and Plum sapling 1200

It's +7 outside, rain. I put the convector at 18 * during the day and 22 * ​​because two-rate counter. I paid for the e-mail and it turned out to be 1100 rubles for two months.

A plot with a foundation is for sale on our street for 900 tr. So my farm is already calmly pulling for 1.2 mult

As I wanted: Lay the EPS, Folgoizolon, TP pipes, Buy two batteries of 10 sections each, an electric boiler and later a wood-burning boiler.

It turned out: the ceiling is insulated with foil insulation and 10 cm of expanded polystyrene, there is a substrate for the laminate on the floor) 1 convector, you will have to take the second one. I think I’ll spend the winter like this, here people in SIP houses live with convectors. So it goes…

Bought: 12.000r Wood-burning stove

250 Polyurethane foam

200 Mailbox

Estimated costs every month:

Gasoline 1000

Elvo, internet, telephones 1200

Credit (2 months left) 3000

Food and household goods: 5,000 approx.

And 8-10 stays at the construction site every month. Norm.

The stove is roasting, on the street +1. at home 20+ While I burn pallets and other waste.

This month I plan to take the slabs and the Makita electric chain saw. I also owe 10,000 on credit card for EPS and PPP.

We sell ready-made log houses from 1 million (away from the city) with plots. In general, if a commerce company sells such a house, then its fat is at least 500 kopecks. The work is very expensive, so if you do everything yourself, it turns out very affordable.

I bought a washing machine for 10.000 and an LCD TV set for 9.000 rubles. EVERYTHING LIKE PEOPLE.

In total, from the beginning of construction, about 250,000 rubles were spent. (Including car and TV.)

In February, I will probably connect IPTV and ADSL Internet.

Meanwhile, gas was installed on the street. If it works out, I'll take a loan in the fall and run it.

Water is also promised in the spring. The cadastral value of the site is already 850 thousand rubles - a good investment, an increase of 200%

The average electricity bill is 1100 rubles per month, at a price of 2.40 per kW during the day and 1.40 at night.

For the whole winter, two gazelles of croaker were bought for firewood at 1,500 rubles each.

The temperature in the house is 23 * C, despite the three-meter ceilings. Aerated concrete keeps heat well.

You can estimate the future scope of work.

Approximate plan until autumn:

Finish the foundation

Build the second half using TISE-2 technology

Make a new large roof

Register house

"Register"

Get tax deduction

Connect gas, make gas heating.

Quit and find a new job.

If you suddenly get rich, make the foundation for the garage.

Stone fence.

Once again, he refused vacation, received compensation for unused vacation pay 12 thousand. Lol.

Kamaz PGS, 5000 rubles

Submersible vibration pump + hose - 1600

12 bags of cement, 3200 rubles

total: 10.000

At the moment, about 260 thousand have been spent.

Today I filled in a meter of the foundation.

Today we finished the main foundation, there are 2 bags of cement left. Tomorrow will begin pouring the faculty under the veranda.

The layout of the extended house needs to accommodate 3 small bedrooms, a staircase entrance and one bathroom.

The "height" shouldn't be too big. 5 meters, for example, is clearly a lot. But at the same time, you need to find a balance so that the usable area is sufficient for the rooms.

It will be a big plus if you don't have to disassemble the old rafters by embedding them in some way.

I chose the cheapest version of the TISE machine. The machine costs 30 thousand, and the walls of TISE will cost me the same.

6 rows are laid out, there are 14. Cement and pgs are slowly coming to an end.

Fence and plot.

Approximately 260 thousand is all invested money, I don’t know how much is left, in principle it doesn’t matter, it’s done for oneself.

Whoever wants to look for plots for themselves is better to look for plots on Avito and in local newspapers, of course, through realtors, they sometimes take in bulk, then cut them in pieces, but I don’t want to feed the system, the main thing is that the land is owned, the type of land IZHS. And whoever has the opportunity, then come and see and find out on the spot. Entrance all year round and good electricity. This is enough.

I have a type of land IZHS, land owned. (No building permit needed, project too)

So, the report. We squeezed a little, bought another 25 bags of cement using a credit card, and 6 cubic meters of sand for 5000. Corners for lintels cost 1000 rubles.

2 KAMAZ PGS were bought, half of the first batch went to the foundation, half of the second batch remained (will go to the floors)

It turns out that 1 kamaz was used up, (6 cubic meters) net 5000r

55 bags of cement, delivery 13.500r

Masonry mesh 500 rub

Roofing material 300r

Total 20,000 rubles. Excellent result!

We finished the walls. We've got it. They began to plaster and whitewash.

Polyurethane foam 500 rubles

Lumber on the roof, delivery 18.300 rubles:

Edged boards 18x5x600 23pcs (rafters, mothers)

Bars 10x5x600 7 pcs (uterus)

Edged boards, grade 2 2x10x600 1 cube (crate)

And the money was left only for food ...

Meanwhile, the bedrock is mutating.

On Saturday, they called relatives, dismantled part of the roof and put 3 rafters, we plan to put the rest on next Saturday.

Costs: 500 rubles for screws and nails

Also today I ordered a corrugated board, 156 square meters, 10 meters of skates, 750 self-tapping screws, 140 square meters of membrane for a space for me the amount of 42 thousand rubles.

Paid by credit card Sberbank.

We bought a screwdriver for 1700r

Hardware products: staples, nails, self-tapping screws 500 rubles

According to an approximate estimate, at the moment, funds have been spent in the amount of 345,000 rubles. A lot of money.

In the meantime, roofing work began.

On the other side, there were not enough boards for the battens. We can buy in addition, possibly with an advance payment.

To the city we have 2 km or 20 minutes on foot. 10 minutes by bike.

There is a bus.

We get to work like this: we get up at 6.20.

at 6.50 we go by car to the city (my father and I have the same schedules).

at 7.00 a working cattle truck leaves for the plant, at 7.45 the beginning of the shift.

The shift ends at 16.20, at 16.50 a cattle truck takes it to the city (15 minutes drive) We get into the car and go home, at 17.30 we are already there.

If you go straight to work by car, then at 4:50 pm you are already at home, but this is an expensive pleasure.

We don't have a project. Wiring in different ways. The bathroom is hidden, there are already all the sockets on an ongoing basis. The rest of the cables are still along the wall, in the future they will be packed in corrugation and will remain under the drywall.

The ventilation will be sewn into the false ceiling.

Bought a seedling of cherries "Besseya" 500 rubles

The roof was almost finished, along the way it turned out that there were not enough skates. Money is tight for now.

Two foam cylinders and a new 1000r pistol

3 bags of cement and paint 1000r

Total: 3000

Old wooden windows and doors were installed and the paint was tinted by hand.

We started pouring the floors.

We are slowly paying off the debt on the credit card, there are 24 thousand left.

It took 7 bags of cement for 1800 rubles to fill the floors

Paint and a brush on the windows for a total of 2000r.

Today we bought 6 meters of pipe d114 for the chimney. 2350 RUB Cheap galvanized steel burned out.

Tomorrow I will cook and start plastering inside.

I have lived in an apartment since birth, for 22 years, now I cannot be driven back with a stick. Although if I sell a house, I’ll have enough for 3-eshku in a new building.

There is freedom, silence. More space to relax, such as buying a motorcycle or motorboat. Garden by hand.

In the meantime, we finished the roof - we bought additional skates for 2000 rubles, cement for 600 rubles. We will plaster the back wall.

The same is done, a lot of other small work. We covered apple and plum trees in case of severe frosts and so on.

Short list of building solutions from 200k:

Try to do everything yourself. It's not difficult, since there is the Internet. Margin for work in finished homes up to 300%.

Choose the land correctly - Owned, the type of land is desirable IZHS. The road and electricity are key. The rest will follow.

Cheap foundation: TISE, MZFL

If you do not know at all from what material to build, choose concrete - a classic. Kindergartens, hospitals, houses - basically everything is concrete.

Always keep warm outside (dew point) Read: Insulation technology "Wet facade".

Do not get carried away with "modern solutions" from "advisers". Foundations for 500 thousand rubles, and other excesses in the theoretical calculation make the cost of building space. Pay attention to old houses.

Is it possible to build yourself a good, comfortable house for 500 thousand rubles? My regular readers know very well what is possible.

Three years ago, a young scientist aldabulsk I built myself a small (105 square meters) house near Rostov-on-Don. He built the house on his own, in the evenings and on weekends, the construction took three months and cost about half a million rubles:

After the publication of the report on the construction, bloggers-experts issued a lot of expert forecasts: that the house will certainly rot and fall apart, that fungus will start in the walls, that the sewer system will clog with sewage, and the very first snow will bring down the roof ...

Fortunately, wintering has shown that the house is unshakable, and mushrooms, mice and insects categorically do not want to settle within its walls:

Today I can fulfill your request. Anatoly sent me a detailed photo report on the current state of the "house for 500 thousand", which I publish in full. Looking ahead, I note that skeptics will be hurt: their hopes were not justified. Everything is fine with the house and its tenants.

Start of report ---

We welcome everyone who is interested, for any reason, in the fate of our home. Yes, yes, we are alive and well, we have even become one more person over the past time - we have a son. Now he is a little over two years old, and he is a serious man, not a dickhead. In the present, the wife of the guy who built the house is writing to you. We didn't even divorce or kill each other.

So, we have lived in this house for three winters. We are not buried under the ruins of our home, and we do not have bearded lichen and moss, although, removing the cat's hair, I'm not so sure of that. Our foundation did not even bulge or crack, as they experienced in the comments. In the spring, during the continuation of the repair, we raised the linoleum and were fully convinced of this. Our house is not damp, not cold, there are no drafts, however, in the summer heat it warmed up quite strongly, so an air conditioner was purchased almost immediately.

We also admit that the majority of the audience was right about, to put it mildly, the unprepossessing appearance of the house. And although we have got used to it over the past three years - after all, you get used to everything, it was decided this year to impose a brick on the house in order to improve the view. Therefore, with a heavy heart, sacrificing the completion of the interior decoration, we threw all our strength on the outside. For long overdue the need to finish the boxes, well, those things on the edge of the roof, you understand, right?

Anticipating numerous comments on this action, we can assure everyone that this was not done for the purpose of warming, strengthening, or God knows what else, with only one thing - to bring the house into a human form, it is pleasant to look ourselves. This masonry itself is attached to that most beautiful green metal profile, which we did not take off, because there is no sense, but there is a lot of trouble. No brick carries a load, it does not save from dampness and cold, if anything.

The first thing that they gladly removed was the terrible concrete tape around the house, which they themselves had created in a state of insanity. An additional foundation for brickwork, resting on the very controversial slab that holds the whole house, and this site took five cubic meters of concrete, and 32 thousand rubles along with payment for work.

Then they hired workers who erected the wall. They did it for a long time, with numerous smoke breaks and holidays, but in the end they did. The brick itself cost us 54 thousand, our hard workers requested only 10 rubles. for laying one piece - a total of 45 thousand in total for the work. It's pretty cheap.

Then I had to re-do the slopes on the windows, here they also hired the boys. The window sills - or whatever they are called - were installed by the husband himself, in order to save money. I didn't even argue, because you can't stop him if he decided something, as you already understood. It turned out to be quite simple. Especially from the outside observing.

The roof was lengthened, the gaps between the rafters were filled with defective bricks.
The long-awaited moment has come - boxes were made of dark brown laminated waterproof plywood. The surface of the plywood is almost mirrored, so it is hardly noticeable.

From the side of the gables, the brick is covered with ebb tides.

This is the only attractive thing in our fence so far - my husband did it for two nights.

The internal situation has actually changed little, since living together on two salaries and three on one, as they say, are two big differences. Our turn to the kindergarten is only coming up next year, so my so-called vacation has been completely free for a long time.

The bathroom, which is also a toilet, was not photographed, nothing has changed, but mold has not appeared, see for yourself. Ordinary drywall steadfastly withstands the stormy delights of our son while bathing. They just put linoleum and rugs on the floor, it's not cold to walk barefoot. Hanging structure - Ikeev's ceiling dryer, in my opinion, is a great invention that saves space. In general, we have IKEA all over the house, you will see further. Yes, yes, we are rogue, but this is understandable.

And comrades, let's make it clear once and for all - we have a toilet bowl, hot water from an 80-liter water heater and a sewage system that takes it all outside the house, into a hole in the yard. Cold water is supplied to our summer cottages by the Azovvodokanal. By the way, the quality of the water has been absolutely disgusting lately.

Everything is still in the bedroom.

A hallway appeared with a wardrobe, a coat rack and a chest to sit and comfortably put on a child's shoes.

It was decided to turn the so-called cabinet into a nursery in the future. For now, this is a place to store all sorts of nonsense. The door was removed when the son seriously pinched his fingers for the second time. For some reason, it was for this joint that he was inflamed with especially tender feelings.

An extractor hood appeared in the kitchen. The little black thing in the corner on the right is an electric mini-oven, which is quite enough for us. The hob is powered by the same gas cylinder. A juicer sticks out on the cabinet - the most useless unit, as it turned out. By the way, this year we have harvested an absolutely record harvest of everything. We still eat pears and apples from our own garden.

The table was moved to the other side, it is convenient to stare out the window.

The entrance to the hallway was decorated with an arch.

A staircase appeared to the attic floor. We have not yet decided how to decorate the entrance beautifully. Most likely, there will be no living quarters there. But so much space for storing terribly necessary things! Where they were located below, we did not understand.

Outside the large window-door, sooner or later, there will be an open veranda, on which we, most likely, are already gray-haired by that time, will begin to drink tea and jam.

The size of our cat excludes the possibility of purchasing a standard scratching post, so we built it ourselves, from scrap materials (a broken stool and a block).

Usurper cat. The son simply sleeps, does not see the disgrace that is happening.

A terrible monster, such as a stove, acquired upon arrival, was given to his brother in the garage. I personally like the fireplace much more. It warms up just as well, the house heats up very quickly if necessary. Now we are still relatively warm, so we hardly use it. Two electric convectors keep the house at 22 ° C. Who cares, in winter, in frosts, we have an average of 5 thousand for electricity.

This is our second floor and our assorted junk. The ceiling height will be 2.5 meters. What will happen here, we have not yet come up with.

This year, at last, at the cost of incredible efforts, made mainly to persuade neighbors to take part in what was happening, we filled up the road to our house (if anyone remembers how it was here in 2010). While my husband was the chairman of this insane asylum, it was possible to make one and a half kilometers of main roads passable at any time of the year. On this, public funds were ordered to live for a long time. Now everyone who wants to, including us, finishes the rest with their own money.

The technology is simple: a broken brick is leveled with a front loader at the rate of one Kamaz per 50 meters. Further, large crushed stone is crumbled in the same proportion. Somewhere it turned out better, somewhere worse, but now you can drive everywhere. Our street is a curmudgeon, so we saved as much as we could on the road, we even laid some of the bricks by hand.

Only those who have walked a lot in rubber boots on the road can understand our happiness. Even in the spring, we often had to extract the poor fellows from this mess with our "Niva" on various machines.

Also, my neighbors and I had to change old wires for new self-supporting insulated wires at our own expense, now we have no problems with voltage. In general, our main problem is not our roads, but fools, and it is not clear how to deal with this. The board of directors in our partnership changes almost every week, you will not believe, such intrigues are woven here! I would like the forester to come and drive everyone to hell out of the forest, both white and red. My husband has already left the post of chairman for a year and a half, amen. Everything that happens does not have the best effect on the general state of the economy.

More important, I guess. The house is fully decorated as a living space through the BTI and regional architecture, all three of us are registered in it. He has flaws, he is not the prettiest, again, but he is our own. Those who have lived for many years in rented housing know what this is about.

Every year more and more young families with children move to our summer cottage settlement. We are planning with our neighbors to build a playground and a football field together. We have enough land here. That's how we live.

End of report ---

Recently, private houses, mainly from a bar, have begun to enjoy great popularity. There are many reasons for this phenomenon. First of all, experts note the environmental friendliness of such facilities. Secondly, the material helps to maintain a constant temperature in the house. For example, in winter it is very warm, and in the warm season, on the contrary, it is cool.

Build a house for 500,000 rubles

Separately, it should be noted the relatively low cost of such houses, compared to objects made from other materials. We offer you log houses up to 500 thousand rubles. this price category is considered quite adequate. The houses have an attic, veranda or terrace. Everything is up to you, as well as the layout. You can independently decide what the layout will be, and where the bathroom and kitchen facilities will be located. In addition, you decide whether the house will be one-story or two-story. Each of the options has several advantages.

Each project of a house from a bar up to 500 thousand rubles is supplemented by one or another architectural structure:

  • Bay window - performed in two or one storey, rectangular or rounded. Increases the area of ​​internal space quite well. In addition, an interfloor staircase can be installed in it, which significantly occupies the area of ​​living quarters.
  • The balcony, designed on the upper level, serves as an excellent resting place where you can relax watching the nature or just sunbathing.
  • Terrace - able to fit on a dining table, at which you will have meals in the fresh air.
  • A garage attached to the building will protect your car from adverse weather or the scorching rays of the sun.

It doesn't matter for what purpose you are going to purchase such a house - for permanent residence with your family or if you want to make a summer cottage out of the house, stop your choice on a bar. The timber is a very high quality material, and it is also characterized by durability. Trust the professionals and you will definitely be satisfied.

Even people with a low level of income can become the owner of suburban real estate in the Nizhny Novgorod region. In our catalog of standard projects, frame houses up to 500 thousand rubles are presented for self-construction in a summer cottage. Ready-made house kits from SIP panels have an affordable cost, so everyone can buy a summer cottage for five hundred thousand and build it in 1-2 weeks on their land plot. There is a misconception that the low price is due to the use of poor building materials, but this is not the case! SIP panels are a modern material commonly used in low-rise construction. Due to their low cost, durability and reliability, frame houses made of SIP panels are popular with connoisseurs of countryside recreation. More than 10 typical projects with excellent design and well-thought-out planning are presented on the site of the Basco company.

Finished house projects up to 500 thousand rubles

Having on hand a small amount of 500 thousand rubles, you can build a turnkey house using high-quality building materials and accessories. This became possible thanks to the improvement of building materials. The gradual decrease in the cost of house kits has led to the fact that everyone can purchase or order the construction of a frame house for 500 thousand. The layout and appearance of the cottage is determined at the stage of choosing a project, after which a house kit for self-assembly is made in production. There are plenty of options for future housing - there are options for suburban real estate with a garage, an attic, with a summer terrace or veranda. How to build a house is up to you. The task of our company is to simplify this process and make housing affordable for all residents of the Nizhny Novgorod region.

Construction of houses up to 500 thousand rubles on a turnkey basis

Buying a two-story house for 500 thousand, you are preparing for disappointment, but in vain. Modern typical designs of houses made of SIP panels compare favorably with similar buildings made of other materials. The main advantages of frame technology:

  • Low price of a ready-made house kit
  • The possibility of self-erection
  • Manufacturer's warranty "BASCO"
  • Good layout that takes into account the interests of each family member
  • Durability, reliability